INTERIOR FINISH
Before this final step is accomplished, it is essential that the pool and surrounding area are kept as clean as possible, and your fence or temporary fence has been installed to meet both local and state codes prior to filling the pool. Any projects which create dirt, dust, smoke or other mess, must be completed beforehand, or postponed until later. The sparkling cleanliness of a fine quality pool depends not only upon the ability of our craftsmen, but in keeping the pool as clean as possible until it is filled. We cannot be responsible for footprints or stains caused by dirt, fertilizer, dust, and other debris from construction, landscape projects or winds.
FILLING YOUR POOL
Once the filling operation has begun, NEVER turn off the water or move the hose from its original position until the level has risen to the middle of the tile band. This eliminates the possibility of a dirt ring, which is difficult to remove. When the pool is full, please turn off the water and inform us. Under normal conditions it is not necessary to call us until the pool is full. There is no harm in not having the filter on, for up to a week after filling. There is also no harm to the pool swimming in the pool before the filter is started.